Coat the spare dog kennel at 703-10B.…
Dominion Energy (DESC) proposes to use a helicopter for aerial broadcast application of a herbicide mix on selected 115-kV and 230-kV electricity t…
The purpose of the Fermi National Accelerator Laboratory (Fermilab) Ecological Land management (ELM) Plan is to enhance the environment and communi…
Bonneville Power Administration (BPA) proposes to clear unwanted vegetation (cutting of approximately 100 post fire danger trees) in and adjacent t…
Subcontractor to empty propane from tanks 1 and 2 at 754-11A.…
Install UW (Universal Wiring) drops for cubicle replacement in 730-1B 3RD floor.…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
701-4G Remove/replace flooring.…
Mass Spectrometer 20 valves A2 and M2 are leaking and need to be replaced. These valves provide argon to the MS-20 system. Though they are used for…
A new AHU is needed for the 234-H Office. Existing supply ductwork from the 234-H Office AHU needs to be disconnected and removed. Once the replace…