The Legacy Management Support (LMS) SOARS team proposes to remove the current data collection equipment at each of the 14 monitoring wells and inst…
Install telecommunications to 706-B.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Ault-Craig 345-k…
The objective of this project is to enhance grid reliability, power quality, grid resilience, and increase efficiency through advanced technologies…
Bonneville Power Administration (BPA) proposes to allow the property owner to remove a flagpole on BPA fee-owned property that has been identified …
The project will conduct reliability initiatives at an existing coal-fired power plant, Kyger Creek Station located in Cheshire, OH, including repa…
Subawardee to replace approx. 94 distribution poles that will harden approx. 1.6 miles of its electrical distribution network in New Orleans. In ad…
This activity will be to perform the 751-1A roof replacement. Remove the old roofing system down to the concrete/metal decking. Install a vapor bar…
Repair the damaged flooring and install decking at the 707-81B Tornado Shelter.…
Subcontractor will repair 705-C. Revision 1 includes the additional work scope at this facility (705-C). Subcontractor will disturb the existing ro…