Renovate interior of Building 703-B, including but not limited to flooring, wall coverings, fixtures, etc. Replace Door No. 3 and remove door No. 4…
Construction group will be renovating 704-H.…
Remove and replace broken floor tiles in 724-H.…
Remove carpet and cove base in 703-46A. Install LVP flooring and new cove base due to wear and tear at the limited area entrance of 703-46A.…
This work scope covers installing new flooring and cove base in building 717-8N.…
Remove and abate mastic tile floor and refinish concrete in 284-10F.…
E-Area Maintenance to Paint the 110 Gallon Drums Needed For Upcoming Work.…
Bonneville Power Administration (BPA) is proposing to replace multiple deteriorating wood pole structures and associated hardware at specific locat…
BPA proposes to maintain low growing vegetation communities in specific, localized areas in and adjacent to the Drummond-Macks Inn No. 1 and Green…
Install biomass feedwater line support at 784-7A. The column will support the weight of the valve, transfer the load to the concrete floor and take…