Categorical Exclusion Determinations: B1.3

Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor. Revisio…
Planned maintenance activities at the 285-H Facility include patching leaks within and surrounding the 285-H Basin, inspecting steel channels withi…