Install a new circuit from Panel B at 705-N including a light switch and nine outdoor LED lights. Also, install an additional receptacle in the rig…
Perform a functionality assessment of Corridor 2 access hatch, K-Reactor.…
The 216-B sump pump has failed and a new one is needed at 105-L facility. In addition to installing a new pump, the existing sump needs to be clean…
The current capacity of 607-7B Sanitary Lift station is undersized based on existing personnel loading in building 730-2B and 730-4B. The 607-7B sa…
Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor. Revisio…
Planned maintenance activities at the 285-H Facility include patching leaks within and surrounding the 285-H Basin, inspecting steel channels withi…
Install electrical and build entry steps at 725-4N (Paint Storage Building).…
Installation of new plant air line and hose reel at 717-10N.…
Prep and Paint 623-29G Communications Tower.…
Prep and paint the 623-29G Communications tower.…