Install Universal Wiring (UW) Drops in 730-1B 2nd Floor Cubes.…
DOE LM proposes to conduct routine inspections, monitoring, maintenance, and aerial surveys at the L-Bar, New Mexico, Disposal Site, located appro…
This activity involves the installation or repair of external oil sampling ports on various electrical transformers throughout SRS. This is a revis…
BPA proposes to conduct maintenance on an access road bridge that crosses Alder Creek in Pacific County, WA. The bridge is used by BPA to access po…
SMECO will install seven distribution automation line recloser devices on Cedarville, MD Substation feeders No. 12 and No. 13 within the Croom area…
Remove/Repair fan baseplate and motor from 903-C fan and replace in 903-A fan if the fan malfunctions.…
This project consists of milling the existing asphalt parking lots located at 704-N, removing and disposing of milled materials, preparing the surf…
Building 731-N habitability improvements due to normal wear and tear over the years.…
Install a new circuit from Panel B at 705-N including a light switch and nine outdoor LED lights. Also, install an additional receptacle in the rig…
WAPA proposes to acquire temporary access rights from willing private landowners for three areas and temporary access permissions from the U.S. Bur…