Western Area Power Administration (WAPA) will rebuild all structures 19/3-32/3A from LaMoure Tap to Fullerton Tap on WAPA’s Edgeley-Forman 115kV tr…

Office of NEPA Policy and Compliance

July 2, 2026
Estimated Read Time   min

Western Area Power Administration (WAPA) will rebuild all structures 19/3-32/3A from LaMoure Tap to Fullerton Tap on WAPA’s Edgeley-Forman 115kV transmission line. All structures will be replaced with the same structure type in the same locations.