This Acknowledgement of Scope provides for the replacement of the front entrance door on the West side of building 7No. 03-1B.…
Install Telecommunications in New Cubes in 704-1N.…
Temporary Power is to be supplied to the Defense Waste Processing Facility (DWPF) Melter Dome Heathers during planned power outage.…
Remove existing material (gravel) to a depth of 6 inches and resurface with 6 inches of asphalt at various locations at SRS.…
727-2N Apply Cool-seal to roof.…
Rehabilitate the Private Parking Lot at 706-N, repair localized pavement distress between the private parking lot at 706-N and the Government Parki…
Correct gate closure at 703-5B per Acknowledgement Of Scope work request 00810427.…
Replace Water Heater at 784-1A.…
Apply roof coatings and seal roof leaks.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to relocate existing Structure 93/4 approximately 50 feet northeast…