Install grounding rod and attach ground wire outside of room 103 located at 703-44A.…
703-10B Remove exterior kennel runs.…
Mobile Equipment Test Station (METS) Variable Frequency Drive (VFD) is to be replaced.…
The Knolls Laboratory (Site) Classified Island General Plant Project will modify existing buildings to establish areas within the Knolls Laboratory that will operate as classified Vault Type Rooms (VTR) within an otherwise unclassified facility.
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending (CDS) to Clark County, Neveda for an energy effici…
Bonneville Power Administration (BPA) proposes to improve access roads along the Jones Canyon-Santiam No. 1 transmission line in Wasco and Marion c…
Bonneville Power Administration (BPA) proposes to replace, upgrade, and/or install new substation and electronic equipment, oil containment, and an…
Bonneville Power Administration (BPA) proposes to provide funds to Sirios Timber Partners to replace a failing culvert with a bridge on a shared ac…
Bonneville Power Administration (BPA) proposes to re-conductor the Glade 115kV Tap serving Franklin County PUD (FCPUD) and Big Bend Electric Coop (…
LM is proposing to install and maintain eight permanent aerial survey quality control (QC) monuments on the Split Rock, Wyoming, Disposal Site and …