This EEC addresses planned renovation activities within 704-L.…
Refresh Walk Path at 730-B, 730-1B, 730-2B, 730-4B Sidewalk/Walkway repair/restriping.…
Maintenance, repairs, renovations, and upkeep will focus on these systems: plumbing, building envelope, electrical, telecommunication, and research…
Bonneville Power Administration (BPA) proposes to fund the Washington Department of Fish and Wildlife (WDFW) to perform ongoing operations and main…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at specific l…
The Bonneville Power Administration (BPA) proposes to replace 6 miles of fiber cable on the Noxon Libby No. 1 transmission line from structure 1/1 …
Bonneville Power Administration (BPA) is proposing to replace three deteriorating wood pole structures, any associated hardware and guys, and elect…
In accordance with FCR M-FCR-A-00149 addressing configuration changes necessary for removal of the existing 780-1A Caustic Tank and Diaphragm Pumps…
Paint piping at 905-100F.…
The proposed work activity is to evaluate a hole in the ductwork of 221-F and perform the necessary repairs.…