The U.S. Department of Energy (DOE) is proposing to provide funding to Nebraska Department of Environment and Energy and the subrecipient, Village …
Repair Drainage in Parking Lot South of 704-60E .…
The subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to …
Removal of LANA material from PS Hydride Beds A and D.…
Subcontractor shall furnish all materials, equipment, tools, supplies, transportation, facilities, labor, supervision, and services required to ins…
This EEC covers various general renovations for Building 723-A, such as flooring/cove base replacement, ceiling tile replacement, painting, and ele…
The existing underground feeder 2-2 (13.8Kv) failed at 151-1L and will be replaced. The PILC cable that has failed was the original cable 70 years …
The Scope of Work details the extraction of asphalt core samples from multiple locations along Road 8 to support SIE (Site Infrastructure Engineeri…
The work scope involves the extraction of three (3) different asphalt core samples, taken at random location along Road G. These samples will be us…
The work scope involves the extraction of asphalt core samples from multiple locations in F-Area to support the widening of the roads to support ad…