Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired. There was no alternative available, because several sit…
Office of NEPA Policy and Compliance
October 7, 2025Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired. There was no alternative available, because several sites were without power. Repairs included splices and insulator replacements and replacement of fused disconnects. Damaged trees from the downed power line were removed.