This EEC to cover renovations, repairs, and modifications to the metal siding and metal flashing of the outside of 786-A.…
In order to protect the integrity of the Deionized Water Basin, over pressurization needs to be avoided. A pressure relief valve is accordingly bei…
Evacuating Air Handler Units 600, 700 and 800 in the 105-L Disassembly Area. These have been removed from service.…
Filter replacement will be performed in front of inner roll-up door in the Truckwell Airlock.…
Sheetrock repair in HBL rooms 270, 287, 603, and 611.…
The general services H-Canyon New Warm Crane (NWC) Radio Frequency system and equipment have become problematic and obsolete. While operating the N…
Implementing a design change (M-DCP-H-18024) to replace the existing process air compressor piping.…
Remove seven vertical power strips and install quad box receptacles at 760-1G Room 13.…
The proposed activity is to evaluate the stairs at the entrance to Building 703-14F. The necessary repairs will be performed as determined by the e…
Disposal of wastewater containing low concentrations of ethylene glycol to Central Sanitary Waste Treatment Facility.…