Bonneville Power Administration (BPA) proposes to re-conductor the Glade 115kV Tap serving Franklin County PUD (FCPUD) and Big Bend Electric Coop (…
LM is proposing to install and maintain eight permanent aerial survey quality control (QC) monuments on the Split Rock, Wyoming, Disposal Site and …
Replace a double door slab on trailer/shed 723-L.…
Handrails, anchorbolts and baseplates around L-Area (exterior) will be repainted to stop rusting.…
Herbicide applications in Solid Waste Management Facilities and F-Area.…
Bonneville Power Administration (BPA) proposes to remedy impairments and install shunts in multiple locations along the South Elma-Satsop Park No. …
Routine maintenance activities and custodial services for SRPPF Complex Area buildings, structures, rights-of-way, infrastructures, during which op…
Bonneville Power Administration (BPA) proposes to repair about 6,800 linear feet (1.3 miles) of access roads and a landing associated with transmis…
Relocate Rosemount Glovebox Oxygen Monitor LL6 pump plate.…
Install new 1 inch rigid galvanized steel (RGS) conduit and conductors to fans VVS-FAN-1 and 2 at 776-1A and 776-4A.…