CX-034645: Inspect and Repair Ponds 7 and 37 Liners

The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perform the work in connection with inspection, testing, and repairs of the Pond 7 (Brine Pond) and Pond 37 (Oil Recovery Pond) liner system.

Office of NEPA Policy and Compliance

October 6, 2025
minute read time

The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perform the work in connection with inspection, testing, and repairs of the Pond 7 (Brine Pond) and Pond 37 (Oil Recovery Pond) liner system, including the weir wall and underside of the Brine Pump Structure.