Installation of four (4) sidewalks at building 730-1B and building 730-4B. Installation of one (1) crosswalk at building No. 730-4B.…
Install Power supply at 717-F remote monitoring station.…
The expansion tank for the 218-H Chilled Water System is being replaced due to deterioration and the new model requires a minor modification of the…
BPA proposes to perform in-kind replacement of ten wood pole structures and associated structural/electrical components (e.g. cross arms, insulator…
Remove existing 125 VDC batteries and replace with new batteries at 681-3G.…
Repair 730-N storm damage.…
This EEC covers the sealing and coating the inside and outside around the base of building 717-1N (Boilermakers Shop).…
BPA is proposing to conduct road work on approximately 15 miles of access roads along the Sammamish-Maple Valley transmission line corridor. The pr…
BPA proposes to demolish an aging 12.5kV control house and replace a 48VDC control voltage breaker. The new breaker would work with the 130VDC batt…
One monitoring well, TNX-076-D, is being installed to provide additional definition of a known Volatile Organic Compound (VOC) groundwater plume ne…