Removal of old Compressor tank and installation of new one.…
Evaluate and correct water damaged tiles in 221-H, section 9 personnel tunnel.…
Provide dedicated circuits for new printers in room 213 in 773-52A.…
The project will upgrade three 4 kV circuits to more dependable 12 kV circuits, with replacement of poles, hardware, and transformers that have rea…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 0-1 to 8-2 and conduct routine acces…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Craig-Rifle (CRG…
The Northern Arapaho Tribe is proposing to conduct repairs to existing source wells associated with the Alternate Water Supply System located on th…
LM is proposing to conduct routine administrative, site inspection, maintenance, and groundwater monitoring activities at the Site A/Plot M, Illino…
Subcontractor shall provide all personnel, equipment, materials, tools, and transportation required to perform wireline services for the SPR sites …
This EEC covers the upgrades required to ensure the N-area "Paint Barn" 725-2N meets or exceeds NFPA Class 1 Division 2 requirements within the int…