Section 3 hot gang valve corridor vestibule AC unit is in failed condition and needs to be replaced. Stagnant air in head tower causes condensation…
Open Glovebox Maintenance (OGM) to replace multiple valves in GB-5. Rev. 1 created to extend activity end date, updated EEC to new version of EEC…
Install Unistrut to wall in Building 707-C Room 356 that will be used to securely mount a gun rack system.…
Construction to upgrade VTC in 730-1B (Room 344).…
Replace 2 sets of wooden stairs at 704-16B with aluminum.…
Installation of Wi-Fi in 708-1B.…
Paint office 43 at 703-43A.…
Portions of the SRTE and H-Area process sewer will be flushed to the H-12 outfall as a facility maintenance activity to determine the source of the…
The Knolls Laboratory (Site) Entrance Utilities Replacement Project (Project) encompasses the removal and replacement of several underground utility sections, some of which are in excess of 70 years old.
Produce cost and design study that can be used to develop a plan for the potential future adaptation and modification and operation of the Watford …