The Knolls Laboratory (Site) Security Upgrade Major Construction Project (Project) encompasses the installation of various upgrades to Site security buildings and infrastructure that is over 65 years old. The upgrades will improve Site physical security and operational efficiency. Existing security infrastructure and buildings will be remediated and demolished as part of the Project.
713-2N and 3N Upgrade all bay lights with LED lamps.…
704-1N Install speakers and route cable.…
Repair Sheetrock Control Joint at 731-2N.…
This EEC addresses planned renovation activities within 704-L.…
Poles H3B545 and H3B546 have been reported bad by Osmose and must be replaced.…
This EEC will replace the terminal block that was found broken during troubleshooting at the 12W sump…
722-4A Universal Wiring upgrades.…
Install Keri Door (Number 1) Infrastructure at 702-A.…
This EEC covers various general renovations for Building 773-43A, such as flooring/cove base replacement, door replacement, ceiling tile replacemen…