Door stoppers on metal doors require repair or replacement…
Subcontractor will repair 707-C. The Subcontractor "will not" disturb the existing roof while performing these repairs on 707-C.…
Installation of CPVC piping to allow for chemical injection in chiller in Building 285-3F.…
This EEC addresses planned renovation activities within 704-L.…
Evaluate and Correct 13.8KV Breaker Fault In Cubicle S2-14 at 151-2C.…
713-N Replace exterior door No. 7.…
Installation of UW Drops 704-1N Rm. 180.…
Installation of UW Drops 704-1N Rm. 117…
Subcontractor will provide roof repairs at 776-1A.…
This EEC covers all low hazard, routine, and repetitive task work activities that can be performed in the Savannah River Mission Completion (SRMC) …