Clearing and Maintenance at Outfalls K-06, N-14, N-15, G-21, F-10, and 188-K Ash Basin.…
An abandoned piece of conduit will be removed and disposed of as LLW.…
Replacement of damaged solenoid valve on 235-F E5 fan.…
Renovation to rooms 139, 140 and 148 in 737-A.…
Replace Fire Alarm Panel / Components at 785-6A and 785-1A.…
The common copper service water header in 784-7A is being replaced with PVC piping. This activity is being performed to minimize the potential risk…
Subcontractor will provide roof repairs at 211-42H. The Subcontractor will not disturb the existing roof while performing these repairs on 211-42H.…
Remove/Reinstall 181 Drain Tank Outlet Valve and Replace Pump P-T181…
The flooring in 702-H will be replaced.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 10…