Configuration Changes Necessary for safe Operation of the Chemical Injection System Which Injects CL4132 to the Service Water Header.…
The current capacity of 607-7B Sanitary Lift station is undersized based on existing personnel loading in building 730-2B and 730-4B. The 607-7B sa…
Building 707-1F is in need of minor repairs/renovations prior to housing personnel in office spaces.…
701-20G Correct Water Line Mounting at Barricade 1 per AOS (Acknowledgement of Scope).…
Maintenance will replace the 704 condenser which has been deemed inoperable due to normal wear and tear.…
Scope of work is being revised to include re-lamping in all of K Area.…
This EEC covers the replacement of broken post and damaged wood structure of 645-8N.…
CX-030902: Repair Ceilings in Rooms 1, 2, 10, 10A, 9 and 9A and Replace Doors where Needed in 711-1N
This EEC covers the repair of ceilings in rooms 1, 2, 10, 10A, 9 and 9A in 711-1N and replacing doors where needed.…
The EEC covers replacing broken glass and painting the door at 717-3N.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Sterling-Sidney (…