Replace fire door assembly at the stairway leading onto the roof at 717-F.…
Install Desk in ISO Container 10 at 645-4N.…
LM is proposing to abandon two LM groundwater monitoring wells and approximately 125 previously-owned U.S. Geological Survey groundwater monitoring…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Town of Mount Pleasant, South Carolina, for the delineation of b…
BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g., cross arms, insulators, guy anchors, etc.) …
The inside perimeter curb is leaking water inside Dome 153 and therefore doesn't meet Resource Conservation and Recovery Act (RCRA) requirements and the safety basis requirements for liquid impediments. The existing curb will be removed and a new concrete curb will be installed.
The Classified Islands project will modify existing buildings to create Vault Type Rooms (VTR).
Process Control Module (PCM) Replacement Portfolio, listed on Tritium Process Control Integrated Project List (TPC IPL) and funded through Maintena…
Clearing and Maintenance at Outfalls K-06, N-14, N-15, G-21, F-10, and 188-K Ash Basin.…
An abandoned piece of conduit will be removed and disposed of as LLW.…