Replace posts and cables that span Lower Three Runs and Four Mile creek bed. These cables support the flow tracking device used to measure stream f…
Subcontractor shall provide all personnel, equipment, materials, tools, and transportation required to perform wireline services for the SPR sites …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Stegall-Gering No…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structure 3/4 and 4/8 on the Boysen-Pilot Butte…
Removal of old fire water drain line and installation of a new one.…
731-1N Paint warehouse floor markings.…
Install a 14 feet x 14 feet concrete slab at 713-3N and a 17 feet x 17 feet concrete slab at 713-2N.…
766-H Room 1061/1066 Nurse Station modifications.…
Section 3 hot gang valve corridor vestibule AC unit is in failed condition and needs to be replaced. Stagnant air in head tower causes condensation…
Open Glovebox Maintenance (OGM) to replace multiple valves in GB-5. Rev. 1 created to extend activity end date, updated EEC to new version of EEC…