CX-034207: Curecanti-Crystal 115-kV Transmission Line, Curecanti-Morrow Point No. 1 230-kV Transmission Line, and Curecanti-Morrow Point No. 2 13.8-kV Distribution Line Right-Of-Way/Access Road Maintenance and Structure/Gate Replacements

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…

Office of NEPA Policy and Compliance

July 15, 2025
minute read time

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (ROW) maintenance, and replace existing structures and gates on the Curecanti-Crystal (CCI-CRY) 115-kV Transmission Line, Curecanti-Morrow Point No. 1 (CCI-MP-1) 230-kV Transmission Line, and the Curecanti-Morrow Point No. 2 (CCI-MP-2) 13.8-kV Distribution Line in Montrose County, Colorado.