CX-034682: North Camas – Sifton No. 1 Span 6/1 Impairment Excavation

Bonneville Power Administration (BPA) proposes to excavate the ground between structures 6/1 and 6/2 on the North Camas – Sifton No. 1 high voltage…

Office of NEPA Policy and Compliance

October 29, 2025
minute read time

Bonneville Power Administration (BPA) proposes to excavate the ground between structures 6/1 and 6/2 on the North Camas – Sifton No. 1 high voltage transmission line. BPA has identified an impairment to the line.