This project is to replace existing 6000 gallon liquid nitrogen bulk storage tanks on the 264-5H gas pad with 9000 gallon tanks, install new phase …
Prepare saltcake simulant following a recipe and measure the physical properties of simulant at bench-top scale. Post bench-top, a full-scale simul…
The goal of the catalyst research is to create innovative materials and intellectual property. This project seeks to develop high performance catal…
The switch for airlock sump pump keeps getting stuck and will be replaced.…
Refurbish/repair domestic water monitoring equipment, wiring, and waterproofing improvements for domestic water pits per attached SOW G-SOW-G-00364…
Troubleshoot and repair fuel oil heaters at building 717-8N.…
Upgrade S-Area DWPF Personnel Accountability System (DPAS) by replacing the old obsolete systems hardware at each of the DWPF entry gates (701-S, 7…
Disconnect Electrical from Crane, K-Area, and Install Junction Box…
The proposed work will involve SRNL support of SRS (as well as other DOE complex facilities) technical activities related to chemical and physical …
This activity covers the maintenance and routine operation of a Horiba duetta spectrometer.…