A Decontamination Trailer will be installed in K-Area to address any potential for a multiple personnel contamination event under Surplus Plutonium…
Renovate radiologically contaminated 773-A Lab Module C-155. A complete D and R (i.e., back to wall studs) and installation of new laboratory equip…
A hydrogen charging station will be installed and used to observe the effects of hydrogen charging on various types of materials…
Repaint 105-L Process Room Floor by light scraping, cleaning, scraping and mixing/applying paint coatings.…
CO Monitor Calibration/PM of the Compressed Air Purification System in 108-1L…
The purpose of this project is to install three (3) new reinforced concrete pipes (RCP) with precast reinforced concrete headwalls on Water Gap Roa…
Construction to install a new ice machine/water dispenser at 704-4N…
Install Water Intrusion Prevention Aids at the K-Area CCO Pad to prevent inleakage. The acronym CCO is Criticality Control Overpack (drums).…
Perform Roof Replacement of Administrative Building 705-K.…
A thermogravimetric analyzer (TGA) combined with a mass spectrometer (MS) are used for characterization of samples containing nuclear materials…