Subcontractor will repair 730-1B. The Subcontractor will not disturb the existing roof while performing these repairs on 730-1B.…
Subcontractor will repair 730-B. The Subcontractor will not disturb the existing roof while performing these repairs on 730-B.…
Insulate piping around M-1 air stripper valveNo. V-RWW003.…
Nitric Acid piping will be installed that provides a transfer path from Tank TK-106 to Tank TK-304. A High-High Level Interlock action to stop Pump…
Premix Air Blender No. 1 Dust Collector (Z-205000-BMH-DCOL-0004) is in need of repair due to brief pressure excursion during normal operation.…
Vent 5 gas cylinders at 737-A.…
Preparation of doping metal oxide (aluminum (Al), chromium (Cr), iron (Fe), lithium (Li), nickel (Ni), molybdenum (Mo), titanium (Ti), tungsten (W)…
This EEC covers the sealing and coating the roof and replacing the damaged door of the bathroom trailer at 718-20N.…
This work scope covers removing/replacing carpet at 704-N.…
731-1N Paint office and warehouse walls. This will include prepping and patching sheetrock and all doors, etc.…