F-Area will remove the starter from the fence and street lighting breakers at 254-13F.…
Some of the old legacy equipment in L-Area is being removed and/or updated. Several pressure relief valves are being removed and updated with other…
Operation and maintenance of the LECO Carbon/Sulfur analyzer for radioactive samples. This instrument detects low levels of carbon and sulfur in so…
Subcontractor will provide roof repairs at 723-A.…
Subcontractor will provide roof repairs at 781-A. The Subcontractor will not disturb the existing roof while performing these repairs on 781-A.…
The Power Conditioner in 735-B Room 508 has failed and is being replaced with a new transformer.…
Replace 702-1C Stand-by Diesel Generator.…
Install telecommunications to bldg. 704-41G. This includes installing grounding, pulling cables, installing 4x8 sheet of plywood and painting it.…
623-29G Install BARD type A/C unit.…
623-34G Install BARD type A/C unit.…