The goal of this activity is to design and develop Flow Through Bed and test it against the performance of a diffuser to determine the feasibility …
HVAC unit ACU-4 in security building 705-A will be replaced due to age and deterioration. Replacement D and R and installation activities will be c…
Repurposing the Next Generation Solvent (NGS) building at the Salt Waste Processing Facility (SWPF) to store Nitric Acid for the cleaning of the St…
The FTF Facility needs a permanent design for supplying Chromate Water (CRW) to F-Tank Farm tanks above grade. The route will start east of Tank 25…
Correct Adjustable Center of Gravity Lift Fixture (ACGLF) Hydraulic Leak at 660-3E.…
The U.S. Environmental Protection Agency (USEPA) and the South Carolina Department of Environmental Services (SCDES) approved soil vapor extraction…
This activity at the M-1 Air Stripper will extend two heat trace circuits.…
The 234-H instrument air COPCO compressors have reached their end of service life and are not operational. This EEC is to evaluate the use of porta…
Replace with like-for-like 4-ton HVAC unit at 701-2K.…
This activity is for the modification of AHU-53.004 (Air Handling Unit) currently located in a Laydown Yard Southeast of 763-52N.…