The purpose of this project is to install three (3) new reinforced concrete pipes (RCP) with precast reinforced concrete headwalls on Water Gap Roa…
This activity will be to perform the 751-1A roof replacement. Remove the old roofing system down to the concrete/metal decking. Install a vapor bar…
Floor tiles that were damaged during a water issue in a hallway near Room 103 of building 736-A will be replaced.…
Repair the damaged flooring and install decking at the 707-81B Tornado Shelter.…
Subcontractor will repair 705-C. Revision 1 includes the additional work scope at this facility (705-C). Subcontractor will disturb the existing ro…
This scope of work is for the painting of exterior shop doors/roll-up doors, and around loading zones at 704-C.…
A vendor will generate and/or remove excess wastewater from various systems/containments located across SRS.…
Subcontractor will repair roof at 716-N. The Subcontractor will not disturb the existing roof while performing these repairs on 716-N.…
In support of an NNSA initiative to increase living / office space for employees without increasing building footprint area, the Building 105-K, Pe…
The goal of this mercury precipitation experiments is to evaluate the use of NaI in the sequestering of mercury from a typical SRS radioactive samp…