This activity will investigate, down-select, and test hydrogen compression systems in lab 155 in 999-2W. Various equipment will be utilized to acco…
The operation of a manual vertical mill machine at Building 999-2W, Lab 137 and associated wastes generated.…
Revision 0 - The Saltstone Facility dry material dust collectors are to be replaced over the next few years due to being outdated and obtaining par…
The Process Science Analytical Laboratory (PSAL) provides analytical support for the Process Science and Engineering Department and other SRNL orga…
Replace Emerson variable frequency drive for being obsolete and limited spare parts.…
The 1st Cycle Programmable Logic Controller (PLC) manufactured by Quantum is now considered obsolete. The replacement plan involves relocating the …
This project will include the generation of hydrogen isotopologues, its impurities and analysis of said compounds by various analytical techniques.…
Activities to support Tank Farm and DWPF with qualification of Sludge Batch 11.…
There is some roof leakage in the 911 fan room louver house area of 105-L ( 26 level). The exact location of the leak needs to be pinpointed and re…
Disconnect and relocate double-wide trailer 773-68A from current location and install in N-Area for reuse. Double Wide trailer (773-68A) was transf…