Complete 249-8H and -9H renovations per AOW…
Several nozzles in the 291-H isokinetic array are plugged with water. Removal of the water will be attempted by increasing air flow to flush it out…
One (1) groundwater monitoring well will be abandoned in place near the F-Area Ash Landfill (288-F).…
Renovate interior of Building 703-B, including but not limited to flooring, wall coverings, fixtures, etc.…
Repair Damaged Fence at 703-5B.…
Install communications via underground fiber to new trailers 722-2N and 722-3N.…
Replace Fleet and Fuel's USTs remote fuel dispensers with equivalent remote fuel dispensers.…
Overhaul of the compressed air system in L-Area due to age/reliability issues.…
730-4B Remove/replace cubes 1st floor Design Engineering area.…
The 233-H SCLU system will utilize silver (Ag) metal mercury (Hg) entrapment technology in the form of Hg traps to unload possible Hg contaminated …