M-DCF-H-13025 is to install a TIDS sample point on to NEVAC Tank B. The sample point would allow for sample bombs to be connected to NE-TB to colle…
The existing H-Canyon Railroad Tunnel (RRT) rollup door has exceeded its expected lifespan and needs to be replaced.…
Replace TRU PAD man doors : 660-14E/660-15E/660-17E/660-19E.…
This scope of work covers the installation of flooring in the women's and men's restrooms in System One section of building 717-5N.…
Work will be completed in a contamination area and tritiated materials will be studied. These materials will be analyzed in small quantities and co…
Characterization of per- and polyfluoroalkyl substances (PFAS) source area soil contamination, well installation, and volatile organic compound (VO…
The staff gauge located at Lower Three Runs, off Dunbarton Blvd, is no longer legible and cannot be accurately read.…
This EEC will cover operation of the Raddec Pyrolyser Combustion Furnace.…
Renovation for laboratory 773-A C142/146 and C-150.…
Repair/replace missing pipe insulation at the LT-061 at 906-1M (M-1).…