238-H is in the process of being decommissioned. Auxiliary plant lines need to be cut and capped to be decommissioned.…
This EEC is a revision of a previous EEC. [OBU-H-2020-0116] This revision updates the previous prefix to SRTE. - Provide seismically qualified SC F…
Replace and/or secure wall tiles at 736-A room 204.…
Install oil boiler fuel flow meter at 784-7A.…
Install copper cable to building 704-12B from manhole.…
Replacement of 251-H DC breaker panel.…
Remove power columns in 731-4N.…
This scope of work was previously evaluated under EEC OBU-H-2019-0019. Since a revision was required and the EEC database no longer uses the previo…
The first product evaporation (1CU) and second product evaporation (2EU) streams are currently equipped with OptiMax Model 6000 Colorimeters to mea…
HVAC units in buildings 781-A and 749-A will be replaced due to age and degradation. Replacement D and R and installation activities will be comple…