The breathing air egress manifold will be replaced to increase flow capacity of the H Canyon Egress system. This will increase the reliability and …
Replace light switch and lights in Rm 3 of building 704-N.…
This EEC is for instruments designated as Gas Chromatograph / Mass Spectrometers (GC/MS) that are used in the Analytical Development Section (ADS) …
Replace split and package units AT 751-1A. The units are old and need replacing.…
Repair the sanitary sewer line in Building 784-7A.…
CX-034607: Add N-Area Generator(s) for Use Greater Than 12 Months to the Insignificant Activity List
Surplus Plutonium Disposition (SPD) has been erecting quonset huts in N-Area. Units that will be used for a process for 12 months or more must be "…
At 607-1F rectangle basin, we will install a temporary cover to prevent water from accumulating inside it. To install this cover, some conduit and …
Rev. 1 - Building changed from 291-F to 221-F. The receptacles for the sump pumps on the 221-F roof will be replaced with a new weatherproof type.…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities to include the action of evaluating items received and preparing for dispositi…