Install Megalug cap on Mud Blow off valve 76H.…
766-H Install a timer on the exhaust fan.…
713-4N Install WI-FI.…
Hydrogen recombiner catalyst material will be evaluated in the Shielded Cells for chemical stability, radiolytic stability, and hydrogen recombinat…
Lighting related work is occasionally needed in K-Area. This includes activities such as maintenance, repair, installation, troubleshooting and rem…
This activity is ongoing and involves the operation and maintenance of an Ion Chromatography (IC) system(s) in 773-A B-134 containment units CHEX h…
735-B Paint room 130 (Alternate Emergency Operations Center).…
Installation of Mechanical and Electrical modifications necessary for R and D, Advanced Materials Recovery Instruments in 773-A, D-0150. …
The proposed activity is to repair the grouted concrete cracks in the exterior walls of Building 772-F…
Titrations of acids and bases will be performed using a ThermoScientific Auto Titrator.…