Roof replacement of multiple roofs on 105-K - Disassembly area, Personnel bldg., Purification areas, Stack area, 911 Fan Room, and Final Storage Ar…
OBU-H-2019-0454, Rev. 1: EEC revised to extend the project end date to 2026. The existing Seismic Detection Subsystem and a Tritium Confinement Sub…
The insulation and jacket for some of the piping outside of A-Line needs to be repaired/replaced.…
This project will upgrade the existing Shield Door Programmable Logic Controller (PLC) hardware with the latest Emerson DeltaV control system hardw…
Road G Milling, Paving, and Striping.…
These work instructions are to safely changeout the leaky eyewash bowl and components for the permanent Eyewash/Safety Shower located at 717-5N.…
A caustic leak has been identified near column 57. Removal and installation of asbestos insulation is required for this repair.…
This EEC covers all flushing, inspections, and maintenance of the fire water systems across the SRS. These activities are conducted by the SRS Fire…
Construction is to replace eyewash bowl/valve assembly in building 717-8N…
Replace 152-7K diesel generator and accessories due to age and difficulty obtaining parts.…