Remove old valve pit cover and install new concrete cover at H-9.…
Augusta Industrial to remove Hazardous Waste Oil from Containers No. 7 and No. 10. Container No. 7 and Container No. 10 will be pumped into drums a…
Replace Emerson variable frequency drive for being obsolete and limited spare parts.…
The 1st Cycle Programmable Logic Controller (PLC) manufactured by Quantum is now considered obsolete. The replacement plan involves relocating the …
719-5N Renovate Drug Alcohol Testing Area.…
The Region 3 Radiological Assistance Program (RAP) is designing and constructing a facility to accommodate personnel, equipment, and vehicles for t…
This project will include the generation of hydrogen isotopologues, its impurities and analysis of said compounds by various analytical techniques.…
In an effort to meet the needs of the site, perform a camera conversion at 701-1A ECF.…
Subcontractor will provide roof repairs at 705-3C. The Subcontractor will not disturb the existing roof while performing these repairs on 705-3C.…
Augusta Industrial to pump approximately 12,000 gallons of Hazardous Waste Oil into Clean Harbors Tankers at 184-2k.…