Repaint fixed contamination at the distillation column area of 105-C.…
The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…
Handrails, anchor bolts and baseplates around L-Area (exterior) will be repainted to stop rusting. Other items may need to be painted such as bolla…
Repair 2 leaking roof drain pipes in 722-A. One is located over cube 131-F and the other is located in the radio shop room 130. …
Remove commodities connecting old Thermal Arc plasma cutter CLI No. N-717001-GSE-STE-480179-in 717-1N, prep for excess. Install new Hypertherm MAX …
Install Fiber 702-H to E-Area Trailers.…
SRNL Advanced Engineering (AE) and Gas Transfer System (GTS) provide gas processing support for the Tritium facilities using non-radioactive isotop…
Three Western Sector Treatment System MicroBlowers connected to soil vapor extraction wells VEW-07F, VEW-11F, and VEW-25A will be converted to Baro…
Repairing holes in sheetrock and painting the offices, Kitchen remodel, conference room Audio/Visual upgrades. Repairing water damage to offices du…
Paint fiberglass cooling water piping and pipe supports near 785-A.…