Construction of pre-manufactured modular offices at the general northwest outer corner of the 186-K Basin. This space is needed for personnel suppo…
In this SRS Tank Farm supernatant liquid (radioactive waste) mercury characterization study, the goal is to sequester total mercury/ionic mercury i…
Drain and Disposition 717-A Drill Press.…
The goal of this activity is to develop a series of adsorbent beds at differing temperatures to selectively remove impurities from a hydrogen isoto…
Roofing Subcontractor will provide roof retrofit on 731-5N. The Subcontractor will not disturb the existing roof while performing this retrofit on …
The Building 789-B serves as the back-up water treatment facility for the Site's domestic water system. The building was last upgraded in 1994. Sin…
The Forestry Service constructs hog barrier fences around Area Completion Projects Operable Units as a cost-saving maintenance activity.…
The interior concrete Wall "F" adjacent to the Expansion Joint at Section 3 and 4 on the east side of the 2nd Level of 221-H is cracked. The crack …
Operation and maintenance of the LECO Carbon/Sulfur and Oxygen/Nitrogen/Hydrogen determinator. These methods determine the concentration of oxygen/…
Install digital signage in 731-N outside of room 132.…