Mold Coating testing is to determine which mold coating is the best and how much will need to be applied.…
H-Canyon's processing of Spent Nuclear Fuel (SNF) and Non-Aluminum SNF (NASNF) fuel will require the SRNL's Nuclear and Chemical Processing (N and …
Centrifugal contactors will be installed in the existing mock-up facility in 716-4A to test for facility acceptance testing.…
Simulant waste streams will be flowed through varying solids (material, particle size, etc.) in order to measure the sorption of contaminants.…
Rev 1: Install new wire/tighten up pulley system for RiverSurveyor.…
Repair of the South and West sheetrock in room No. 2 and all sheetrock in room No. 3 in building No. 702-F. This includes: replacing cove base, pat…
Paint 802-50BC Steam Meter Cabinet near H Area.…
Remove ACM in steam room at 703-A. Remove ACM insulation from steam line and reinsulate with non-asbestos insulation.…
Replace a failing 42-inch corrugated metal pipe (CMP) located at the southeastern side of 730-4B building with a 42-inch class III reinforced concr…
Spent Material Clean-up within the 725-1N Abrasive Blasting Operations Area and Minor Maintenance of Silt Fence…