701-2L has a door that requires replacement of the door and frame to ensure the new door operates normally with ease. Another door needs repair wor…
Replace existing lighting fixtures with LED fixtures in building 711-N.…
Install locking receptacles, duplex receptacles, and LED Lights. Installing two 480v receptacles, three 120v receptacles, and one 280v receptacle. …
Bench testing and troubleshooting activities primarily for robotics at the Advanced Manufacturing Collaborative.…
Legacy chemical containers in 105-C will be sampled and then disposed of following characterization.…
A 9975 package is being heated to a temperature of up to 250F with external and internal heaters.…
The project scope consists of the renovation and modification of building 705-A to support the development of a new computer room.…
This R and D activity will investigate the effects of various processing conditions on the synthesis of catalyst materials. Isotope exchange effici…
The proposed work will involve studying effectiveness of VCIs (Vapor Corrosion Inhibitors) in the presence of bacterial activity and measurement of…
This scope of work covers activities associated with the development of electrolytic cell components for cells such as sulfur dioxide depolarized e…