The purpose of this Scope of Work (SOW) is to proactively replace the aging transformer currently installed at 252-4H which supplies power to the 9…
Revision 0 - The Saltstone Facility dry material dust collectors are to be replaced over the next few years due to being outdated and obtaining par…
The Process Science Analytical Laboratory (PSAL) provides analytical support for the Process Science and Engineering Department and other SRNL orga…
Cleanup asbestos around 784-A.…
Renovate Facility 704-16G.…
The method concerns generating small grout cylinders by stabilizing radioactive liquid to demonstrate radiolytic behavior of the grout form, includ…
Install sidewalk on west side of 780-2A.…
Install UW Drops for Cubes in 730-4B 3rd Floor.…
703-1B and 730-4B Install fiber cables between buildings.…
Subcontractor will repair 705-C. The Subcontractor will not disturb the existing roof while performing these repairs on 705-C.…