In order to protect the integrity of the Deionized Water Basin, over pressurization needs to be avoided. A pressure relief valve is accordingly bei…
Uranium will be separated from radioactive sample matrices by use of UTEVA resin. Liquid residue will be created from the additional radioactive ma…
Accumulated rainwater is to be pumped from the 607-1F primary sedimentation tank (rectangular basin) and sludge digestion (circular) tank to the 60…
The scope of this work order is to clear the dirt and debris from the raceway trough near the South Steam Station. The conduits in the trough will …
Remove target system from Range 7 and prepare the area for installation of a new system.…
905-119H Flush Line needs a hard pipe discharge connection to the basin to mitigate a safety hazard. A flow meter will also be installed to provide…
The above ground make-up water piping behind the 285-H basin is out of service and creates an unnecessary trip hazard and leak point. This design d…
Installation of a siphon tower on Tank 38 in H Tank Farm.…
The South Carolina Department of Transportation (SCDOT) plans to execute a quitclaim deed transferring 1.5 acres of land and improvements to the U.…
Analyze environmental samples from SRS water bodies for mercury (Hg) isotopes to help determine point source. …