The Savannah River Site Forest (SRSF) plan to install five portable building trailers, for use by SRSF.…
Replace split and package units AT 751-1A. The units are old and need replacing.…
Paint piping, metal risers, and pipe support around 785-2A.…
This EEC covers the building of a new room for B-level storage in 713-N.…
Replace posts and cables that span Lower Three Runs, Steel Creek and Four Mile creek bed. These cables support the flow tracking device used to mea…
Disassemble and Remove UPS System and repair sheetrock in 702-F. The UPS battery system is no longer in use, and it needs to be removed from 702-F.…
Install new associated utilities to support a new Ice Maker in 217-3H.…
This activity is for completion of Safe Shutdown thru Phase 1 Deactivation of 237-H/238-H/238-1H facilities. Although individual building numbers, …
In support of the Disposition Planning for the K-Area Complex, Building 108-4K is proposed for Dismantlement and Removal (D and R).…
Removal of 10 handi-houses and 3 Sealands located on one of star pad legs in B Area.…