The proposed activity is for Radiological Protection Department to perform a radiological survey of the building 235-F second floor exhaust ductwor…
Three (3) groundwater monitoring wells (i.e., RGW-16-C, CSB-020-B, and CSB-020-C) will be abandoned in place and three (3) replacement monitoring w…
Prep/Paint 681-3G gantry crane, catwalk rails, and concrete curb.…
Evaluate / Correct Deep Well 905-107G.…
Installation of Tornado Shelter 707-3N.…
714-2N Roof retrofit replacement.…
Revision 2: Updated proposed activities to reflect current planned activities. The Surplus Plutonium Disposition Project is occurring in K-Area, bu…
The South Carolina Department of Transportation (SCDOT) plans to execute a quitclaim deed transferring 1.5 acres of land and improvements to the U.…
Replace obsolete TEF Furnace Extraction Turbomolecular Pumps. Design is required for installation of replacement model pumps and associated pump co…
784-7A Vendor to Clean Various Locations in Powerhouse.…