Subcontractor shall provide services of equipment, materials, and facilities to perform, services necessary to conduct Maintenance and other relate…
The scope of the activity is to recoat the interior and exterior of the 682-G elevated domestic water storage tank.…
Scope includes recoating interior surfaces, including ladders, floors, manways, roof hatches, vents, funnels, and piping, but not cathodic protecti…
The scope of work includes recoating interior surfaces, including ladders, floors, manways, roof hatches, vents, funnels, and piping, but not cathodic protection system anode strings. Piping shall be coated to the first flange above grade or as close to grade as possible (excluding insulated, galvanized, or non-metallic piping).
This project is for building an office inside of room 230 of building 704-4N.
Savannah River Site (SRS) has identified two viable locations, Sites C and G, that could support a utility-scale solar power plant to achieve the goal of 100 percent Carbon Pollution Free Electricity by 2030. A meteorological weather station will be installed at Solar Site C to gather data.
Construction to modify existing ice maker with a new bigger bin and install another new ice machine at 713-N.
Subcontractor will provide roof repairs at 704-32G.
This activity is for the Renovation of Tornado Shelter walkways (aluminum landings, modular ramp, concrete sidewalk). The renovations include walkways at the following shelters: 707-29F, 707-30F, 707-31F, 707-32F, 707-33F, 707-34F, 707-35F, 707-36F.
Subcontractor will provide roof repairs at 703-1B.