Replace the flooring in rooms No. 1 and No. 2 of building 702-D.…
Habitability improvements in rooms No. 101, No. 102, No. 103, No. 104, and No. 105 in building No. 731-4N.…
Removal of equipment originally used by MOX from Building 221-21F to Excess/Salvage - Salvage Yard Transfer Building 741-1N. Preparation includes, …
The existing Buildings 264-H and 264-2H Safety Significant (SS) Fire Suppression Systems (FSS) need to be upgraded/qualified to meet Seismic Design…
CX-035390: Replacement of Scanning Electron Microscope (SEM) in Inert Metallography Laboratory (IML)
The JEOL JSM-6460LV Scanning Electron Microscope (SEM), along with all peripheral attachments, are to be removed and replaced with a new SEM. The n…
Subcontractor will provide roof repairs. The Subcontractor will not disturb the existing roof while performing these repairs.…
Remove Lead Blankets from Sealand and Remove Mold.…
The breathing air egress manifold will be replaced to increase flow capacity of the H Canyon Egress system. This will increase the reliability and …
Grouting of Intermediate Level Vault (ILV) Cells. Cells to be grouted are Intermediate Tritium (IT) Vault 2, Intermediate Non-Tritium (INT) Vault 4…
This is a general EEC to cover the synthesis of dust from various mineral oxide powder starting materials. Test dust materials will be synthesized …