This scope of work covers general R and D activities performed in 773-A Lab C-064, activities performed may include any of the following. All resea…
This EEC covers the use of the non-rad pyroprocessing system. The pyroprocessing operations to be tested on this system are molten salt extraction …
The work for this project is being completed under FY25 LDRD-2025-00220 Project, Achieving Systems-Level Full Potentials in Sustainable Bioenergy. …
The operation of a manual lathe machine at Building 999-2W, Lab 137 and associated wastes generated.…
Low molecular weight gas analyses are performed using Thermo Fisher Scientific 271-Ultra High-Resolution Mass Spectrometer (HRMS) to evaluate and d…
The Department of Defense (DOD) would like to develop a High Voltage Electrical (HVE) training range on Savannah River Site (SRS) in collaboration …
Evaluate, correct, and overhaul chiller No. 2 and return to normal working conditions in HB-Line.…
Install Video Teleconference (VTC) in 717-11A.…
A buttress wall addition is being added to the Saltstone Vault 4, North Wall, for structural support…
This EEC is a revision of a previous EEC with a different prefix [OBU-H-2021-0225]. The PA is a redesign of the existing Glovebox Stripper blowers …