Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort. …
Install Road from S-Area to 299-H through CIF (607-35H) gates.…
Replace 24" MOV hardware at 681-3G.…
This task will involve the fabrication and testing of glasses containing depleted U3O8 and ThO2.…
Operation of a six-axis robotic AM system in 723-15A.…
The Chemical Flowsheet Development (CFD) personnel will conduct laboratory scale simulations of the Defense Waste Processing Facility (DWPF) proces…
Non-radioactive laboratory testing using simulants to study evaporative separation and solution oxidation, hydrolysis, and solubility of trace regu…
This DCP modifies the spare Mass Spectrometer 4 (MS4) footprint in 264-H. …
Paint F-Area steam pole brackets.…
The Assembly side of 105-C has some insulation paneling that is coated with Asbestos Containing Material (ACM) mastic. A few panels have fallen and…