This scope is for installing storage shelving and removing existing storage cabinets from room No. 153 in Building 731-N.…
Dake Johnson Band Saw in 711-2N is being excessed due to normal wear and tear and age of equipment. This vertical saw will be replaced with a new v…
Insulate domestic water line above restroom in Bldg. 717-8N.…
These work activities are associated with the electrical repairs/upgrades to building 717-3N.…
Install two prefabricated trailers (705-57H and 705-58H) in the northeast parking lot of 766-H.…
Installation of Video Teleconference (VTC) at 709-7G Room 102.…
Grind concrete floor to assure proper operation of the installed room divider at 705-3C room 134 per AOS work request 00841143.…
Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor.…
Installation of new Quad wide trailers (707-69B, 707-72B, 707-73B, 707-74B, and 707-75B) and utilities and two restroom trailers and utilities (707…
The Hand Geometry Units (HGU) for access to 703-42A requires replacement. The ability for designated qualified personnel to access their work space…