731-3N Fire System Upgrade.…
731-1N and 731-2N Install outdoor WIFI devices.…
Replace Manual Transfer Switch-001 for Curing Room at Building 717-5N.…
Installation and utilization of the Portable Stack Sample System will maintain SRNL exhaust air samples for the 791-A Sandfilter Exhaust Stack, dur…
Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort. …
Install Road from S-Area to 299-H through CIF (607-35H) gates.…
Replace 24" MOV hardware at 681-3G.…
This task will involve the fabrication and testing of glasses containing depleted U3O8 and ThO2.…
Operation of a six-axis robotic AM system in 723-15A.…
The Chemical Flowsheet Development (CFD) personnel will conduct laboratory scale simulations of the Defense Waste Processing Facility (DWPF) proces…