Remove and replace broken floor tiles in 724-H.…
The current method of filling the basin is an altitude valve designed to make up for large drops in basin level and not for routine smaller changes…
Remove carpet and cove base in 703-46A. Install LVP flooring and new cove base due to wear and tear at the limited area entrance of 703-46A.…
This work scope covers installing new flooring and cove base in building 717-8N.…
New stretch wrap machines will be installed at the 731-N Complex.…
Remove and abate mastic tile floor and refinish concrete in 284-10F.…
This EEC will cover the laboratory preparation and analysis (within the analytical services shared lab) for environmental samples from multiple res…
This experiment is being conducted to assess temperatures, pressures, and materials proposed for trapping zinc in the tritium facilities. Revision …
E-Area Maintenance to Paint the 110 Gallon Drums Needed For Upcoming Work.…
Install biomass feedwater line support at 784-7A. The column will support the weight of the valve, transfer the load to the concrete floor and take…