Comprehensive Force-on-Force (CFoF) exercises that are conducted by Centerra - SRS are as realistic as possible and conducted in a safe manner. CFo…
Perform building 703-1B renovations.…
There is an issue of water drainage between 716-N and 713-N Buildings. Water is ponding against the roll-up doors of 716-N and corrective actions a…
Replace the life rings and racks at basins 281-1F and 281-5F.…
Replace well water flow meter to 285-H that is currently inoperable.…
Remove legacy pressure relief valves from unused water heaters in domestic water system in 105-L, 108-1L, 108-2L and 704-L.…
Rad Monitor replacement at F and H Retention Basins.…
Add crusher run and grade as needed in storage areas and additional area at 713-2N.…
Remove/Reinstall 181 Drain Tank Outlet Valve and Replace Pump P-T181. This EEC is a revision to OBU-H-2024-00028 to extend the end date.…
Storm drain piping in 105-L will be replaced…