Renovations to High Bay Rooms in Training Support Building 766-H and Installation, Maintenance, and Operation of equipment for use by SRPPF Trainin…
Aluminum Canopy Placed Adjacent to 711-K…
This work involves the use a new reactor manifold in lab 154, 999-2W. The purpose of the reactor is to qualify the performance of heterogeneous cat…
This project will evaluate materials for anhydrous Hydrogen Chloride(HCl) and anhydrous Hydrogen Fluoride (HF) removal from hydrogen streams.…
General Operation and maintenance of the Radioactive Permeation System in 773A.…
The purpose of this work is to better understand the proposed flowsheet for the discard of contaminated bulk graphite materials. …
Scope for instructions tab for all 3 tasks: Pressure switch for Fuel Pump 619-4N malfunctioned causing fuel oil to leak in the shop area at 717-3N.…
Centerra-SRS personnel would like to test fire ESS weapons in B-area prior to each Force-on-Force (FOF). Canine(K-9) Department desire to perform K…
713-2N Repair damaged high-bay building insulation that is torn.…
Paint exterior of spare 18" river water globe valve.…