The aboveground make-up water piping behind 285-H basin is out of service and creates an unnecessary trip hazard and leak point. This work removes …
The scope of work for this project involves the refurbishment of the women's changing room on the first level of 221-H. The tasks include wall repa…
This activity will investigate, down-select, and test hydrogen compression systems in lab 155 in 999-2W. Various equipment will be utilized to acco…
The operation of a manual vertical mill machine at Building 999-2W, Lab 137 and associated wastes generated.…
Rewire 702-A with CAT6A wire for installing hall monitors.…
Pump Out Waterjet Tank in 773-50A.…
Patch and paint room 112 in 730-B.…
A subcontractor will remove sludge and/or wastewater from various sanitary wastewater systems at SRS.…
The purpose of this Scope of Work (SOW) is to proactively replace the aging transformer currently installed at 252-4H which supplies power to the 9…
Revision 0 - The Saltstone Facility dry material dust collectors are to be replaced over the next few years due to being outdated and obtaining par…