Replace and re-route the conductors used for the north side motor on TRU Pad 3 in E-Area. Remove the receptacles mounted to the south side of the P…
The current Portable Air Compressors have recently been replaced to increase reliability of backup process air. In addition to these new 3 compress…
Lab 144 is used by Hydrogen Processing Group for general R and D activities. These activities include using the cold saw, drill press, and belt san…
Operation of spark plasma sintering (SPS) equipment in HTRL 136.…
The AbrasiMet M Saw will be used to section metallurgical samples (steel, stainless steel, aluminum) for support of R and D programs.…
Replace Automatic Entry Doors at 730-2B and 730-4B…
This EEC covers stormwater outfall N-06 and N-12A stormwater controls (oyster shell replacement) / maintenance (culvert repairs)…
Extraction of core samples on Schmitt Road in N-Area in preparation for road rehabilitation.…
This work consists of removing an out-of-service safety shower/eyewash station and its indicator light from Room 35 in 233-H. This D and R is to pr…
Four double-wide trailers will be removed and replaced with (4) new double-wide trailers in the same locations. The old trailers will be excessed o…