The Purpose of this project is to repair and restore the Kennedy Pond Bridge (603-41G) embankments damaged due to scouring occurring at both abutme…
Installation of four (4) sidewalks at building 730-1B and building 730-4B. Installation of one (1) crosswalk at building No. 730-4B.…
Install Power supply at 717-F remote monitoring station.…
Upgrading the SRS technological infrastructure by installing underground fiber optic cable at various locations across the site.…
Subcontractor will remediate the mold and remodel building 704-49S.…
The Parrott lab is conducting research concerning the effects of contaminants on ecological and reproductive health in various herpetofauna species…
The expansion tank for the 218-H Chilled Water System is being replaced due to deterioration and the new model requires a minor modification of the…
To assist in federally funded inkjet printing research activities to support NNSA NA-24 nuclear safeguard activities, specialized printing substrat…
Dry High Flux Isotope Reactor (HFIR) storage pilot testing project to be implemented to evaluate storage of spent nuclear fuel in L-Area.…
Remove existing 125 VDC batteries and replace with new batteries at 681-3G.…