Advanced Engineering Fabrication, Assembly, Testing, Installation, and Maintenance of a table frame and robotic arm handling of objects.…
This EEC covers planning activities for F/H Lab Tank Cells A, B, C, and D deactivation.…
Subcontractor will provide roof repairs at 710-14N.…
Repair/Prep and Paint Walls in 705-K Room 133…
Roof repair at Building 717-K.…
This study aims to better understand patterns and processes of nonstructural carbohydrate (NSC) reserves across longleaf pine life history stages, …
This evaluation covers operation, maintenance, and installation of solvent extraction equipment and centrifugal contactors used for solvent extract…
HVAC-FAN-D8 in the small outside courtyard of Building 735-A needs to be replaced due to age and deterioration.…
Induction Melter technology will be used to test various glasses for technology compatibility of waste glass vitrification.…
Calcium carbonate will be electrochemically decomposed to prepare calcium hydroxide and subsequently calcium oxide.…