As part of externally funded projects, aerosols will be generated and allowed to collect on a variety of substrates.…
Advanced Engineering Fabrication, Assembly, Testing, Installation, and Maintenance of a table frame and robotic arm handling of objects.…
This EEC covers planning activities for F/H Lab Tank Cells A, B, C, and D deactivation.…
Subcontractor will provide roof repairs at 710-14N.…
Repair/Prep and Paint Walls in 705-K Room 133…
Roof repair at Building 717-K.…
This study aims to better understand patterns and processes of nonstructural carbohydrate (NSC) reserves across longleaf pine life history stages, …
This evaluation covers operation, maintenance, and installation of solvent extraction equipment and centrifugal contactors used for solvent extract…
HVAC-FAN-D8 in the small outside courtyard of Building 735-A needs to be replaced due to age and deterioration.…
Induction Melter technology will be used to test various glasses for technology compatibility of waste glass vitrification.…