Receipt, loading/unloading, and shipping/transport of various shipping containers.…
Construction to erect and maintain a radiological hut 0n Bldg. 794-A roof to remove a damper cover and open the damper. The radiological hut buildi…
Mixing roughly a 5-gallon bucket of Powerpozz metakaolin (SDS 67521) with water in a hood.…
Perform mercury analysis (EPA Method 7473) using a Milestone Direct Mercury Analyzer (DMA 80).…
This activity details the general operation of the FormLabs SLA resin 3D printers (Form2 and Form3 variations) along with the post-processing tasks…
This EEC covers general use and maintenance of the Attune NxT flow cytometer and the associated autosampler located in 999-1W lab 106. This activit…
Gas mixtures will be created by PVT using pressure transducers. The gases that will be mixed include H2, D2, He, N2, Ar, CO, CO2, CH4, NH3, SF6, H2…
The Western Sector Treatment System has remediated soil and groundwater. As the remediation has matured, much of its equipment is no longer necessa…
The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…
Road D milling, paving, and striping.…