Part of the roof of Building 281-19F was previously damaged during a storm. The building does not require a roof and to eliminate a potential safet…
722-4A PMCS To remove 12 inches of insulation.…
Subfloor Repair/Replace and Carpet in 704-738K.…
Remove velcro, mud and paint walls in 730-2B, Room 222.…
H-Canyon and Outside Facilities TSR (S-TSR-H-00006, Rev. 18), Section 5.7.2.35 states that "The Backup Vessel Air Purge Program shall be establishe…
Installation of Single Wide Trailer at 711-6N.…
The JEOL JSM-6480LV SEM, along with all peripheral attachments, are to be removed and replaced by a new SEM and its needed peripheral attachments
Cut out 2 blisters and install a 20 feet x 3 feet patch using cement and membrane. Install a 3 inches drain insert using water block and an 8 feet …
Repair door and pressure wash 707-67B and 707-66B.…
This instrument will be used to characterize solid/powder materials both morphologically and chemically through image and EDS (Energy Dispersive X-…