In an effort to meet the needs of the site, perform a camera conversion at 701-1A ECF.…
Subcontractor will provide roof repairs at 705-3C. The Subcontractor will not disturb the existing roof while performing these repairs on 705-3C.…
Augusta Industrial to pump approximately 12,000 gallons of Hazardous Waste Oil into Clean Harbors Tankers at 184-2k.…
Remove waste oil from two 500 gallon containers (Container No. 8 and Container No. 9) at 716-4N.…
Various oils will be transferred from old drums to new drums in Building 703-14F.…
The scope of work for renovating Building 704-2H includes applying coatings to the walls, replacing the bathroom vanities, removing carpet, and ins…
Approximately 1500 linear feet of 6-inch PVC domestic water piping with appurtenances shall be replaced. The domestic water line shall be replaced …
Conversion of 730-2B LAP (Limited Area Pocket) security system.…
766-H Renovate Stairwells.…
Replace/install new carpet in Building 741-N.…