Installation of new Quad wide trailers (707-69B, 707-72B, 707-73B, 707-74B, and 707-75B) and utilities and two restroom trailers and utilities (707…
730-1B NNSA Executive Office Suite Renovation. A portion of the third floor of 730-1B will be renovated for a new NNSA executive office suite.…
The 735-4B exterior light fixtures have been experiencing increasing reliability issues and recent safety concerns have been raised by the building…
Make plant air modifications for 717-F.…
Control room and restroom renovations at 681-3G.…
The reason for the change is due to the existing 3/4" blowdown being used to release water from the cooling tower basin being undersized for its in…
Pressure Wash and Paint Domestic Water Wellhouses at 905-155G, 905-115G, 905-158G, 905-111G, 905-126G, and 905-108G.…
A new receptacle will be installed at 704-16G in support of a dishwasher.…
Fabricate and install a new sprinkler pipe stand at 315-M.…
704-1N Installation of 5 RFID (Radio Frequency Identification) portals in the PCA (Personal Computer Administration) warehouse.…