Load Solvent from the 900-Series Tanks in H- area outside facilities (OF-H) into Portable Tanks for Transportation Offsite for Final Disposition…
Remove Sump Pump at TRU PAD#6 and Modify Piping.…
The scope of work will include prepping duct wall for paint, and applying paint coatings once wall has been prepped, Rev 1 The maintenance shop in …
The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…
This EEC supports activities post Cold and Dark status of Building 235-F. Revision 6 includes work in 701-1F, 720-F, 252-9F, and removal of perimet…
Circuit cards that are in need of repair have a conformal coating making it difficult to take measurements to identify non functioning components. …
This EEC covers disconnecting commodities to seatrains 763-118N and 763-119N to prepare for relocation.…
Replace a safety shower and associated piping in L-Area. The old unit is in bad shape and the filters are unavailable due to age.…
Replace obsolete TEF Furnace Extraction Turbomolecular Pumps. Design is required for installation of replacement model pumps and associated pump co…
Install HT-TCAP Feed/Product transfer Lines…