Renovate interior of Building 703-B, including but not limited to flooring, wall coverings, fixtures, etc.…
Repair Damaged Fence at 703-5B.…
Install communications via underground fiber to new trailers 722-2N and 722-3N.…
Replace Fleet and Fuel's USTs remote fuel dispensers with equivalent remote fuel dispensers.…
Overhaul of the compressed air system in L-Area due to age/reliability issues.…
730-4B Remove/replace cubes 1st floor Design Engineering area.…
The 233-H SCLU system will utilize silver (Ag) metal mercury (Hg) entrapment technology in the form of Hg traps to unload possible Hg contaminated …
Testing will be performed in the 773-A E-wing Shielded Cells. The glass will be composed of frit, non-radioactive simulant (fabricated at 999-1W), …
Certified sealed radiological sources will be shown to radiation detection devices and the response of the device will be monitored and recorded.…
Salt simulant solutions and cementitious waste forms representative of waste forms from SRS will be prepared at 999-1W. Some waste forms may be sen…