Testing of heater capability in support of He-3 recovery from retired hydride beds will be conducted at 999-2W. "Clean" beds and lanthanum nickel a…
Permeation of hydrogen and deuterium through various materials will be evaluated.…
Hydraulic testing of the Gordon Aquifer (GA) at CMP Pits will provide beneficial data to support ongoing monitoring activities at the groundwater u…
Revision to: EC-A-2022-0001. Entry into new EEC database and extended activity end date until 2028…
707-C Remove wallpaper and paint foyer.…
Construction is to insulate and secure domestic water line in building 718-20N.…
A Decontamination Trailer will be installed in K-Area to address any potential for a multiple personnel contamination event under Surplus Plutonium…
Renovate radiologically contaminated 773-A Lab Module C-155. A complete D and R (i.e., back to wall studs) and installation of new laboratory equip…
A hydrogen charging station will be installed and used to observe the effects of hydrogen charging on various types of materials…
Repaint 105-L Process Room Floor by light scraping, cleaning, scraping and mixing/applying paint coatings.…