The scope of this work order is to clear the dirt and debris from the raceway trough near the South Steam Station. The conduits in the trough will …
Remove target system from Range 7 and prepare the area for installation of a new system.…
905-119H Flush Line needs a hard pipe discharge connection to the basin to mitigate a safety hazard. A flow meter will also be installed to provide…
The above ground make-up water piping behind the 285-H basin is out of service and creates an unnecessary trip hazard and leak point. This design d…
Installation of a siphon tower on Tank 38 in H Tank Farm.…
The South Carolina Department of Transportation (SCDOT) plans to execute a quitclaim deed transferring 1.5 acres of land and improvements to the U.…
Analyze environmental samples from SRS water bodies for mercury (Hg) isotopes to help determine point source. …
Repaint fixed contamination at the distillation column area of 105-C.…
The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…
Handrails, anchor bolts and baseplates around L-Area (exterior) will be repainted to stop rusting. Other items may need to be painted such as bolla…