Repair drain standpipe at 784-7A. The standpipe and some of the associated piping used for drainage located at 784-7A has corroded resulting in lea…
The work instructions are to safely disconnect the tank from the chilled water loop and "abandon in place" per M-FCR-A-00130.…
Temporary Power will be supplied to the Process Building (210-Z) and Operations Building (704-Z) in Saltstone during B12 Outage.…
New lighting is to be installed in Cylinder Storage Building 734-Z.…
Flow Instrument FIT-7805 is to be replaced with new model at 210-S.…
Mixing of epoxy chemicals and aggregate on a small-scale to form samples of epoxy grout.…
This EEC covers special methods for the Radchem Group's postdoc projects, LDRD, nonroutine chemicals, etc.…
Operations in the x-ray diffraction laboratory (773-A C-119/123) in the Savannah River National Laboratory (SRNL) consisting of the following: a ra…
CM 4351 REPLACE HEATERS IN BM SHOP and 717-1N. CM 4369 INSTALL NEW WELDER and 717-1N. CM 4298 INSTALL PRESS BRAKE and 711-N. CM 4381 INSTALL NEW…
This EEC covers minor sheetrock repairs, painting and replacing damaged cove base in 704-N.…