Subcontractor shall remove propane from the Lead Melter Propane Tank at 711-4N so Construction may replace the failed Rego manifold and test PRVs(P…
This Temporary Modification will install a Peterson Products Company Multi-Flex inflatable plug inside manhole P68 near the 234-H cooling towers.…
Restore Tank 709 level control to original design with new float style Kimray level controller (LC-415) in H Canyon.…
Subcontractor will repair 790-5B. The Subcontractor will not disturb the existing roof while performing these repairs on 790-5B.…
Subcontractor will repair 730-1B. The Subcontractor will not disturb the existing roof while performing these repairs on 730-1B.…
Subcontractor will repair 730-B. The Subcontractor will not disturb the existing roof while performing these repairs on 730-B.…
Insulate piping around M-1 air stripper valveNo. V-RWW003.…
Nitric Acid piping will be installed that provides a transfer path from Tank TK-106 to Tank TK-304. A High-High Level Interlock action to stop Pump…
Premix Air Blender No. 1 Dust Collector (Z-205000-BMH-DCOL-0004) is in need of repair due to brief pressure excursion during normal operation.…
Vent 5 gas cylinders at 737-A.…