Due to their age, the MAC solenoid valves for the Room Air Monitoring System located in solenoid valve rack SCLU-RK-44R3 require replacement.…
This Revision was created to extend the time period required for the open glovebox maintenance and include additional information on the expected r…
Remove the wooden transformer platform at 501-A per E-FCR-A-00216 which will consist of performing electrical modifications such as removing existi…
Replace Fire Alarm Panel at 784-7A.…
Renovate 784-3A restroom.…
Subcontractor will provide roof repairs at 716-8B.…
This activity is to replace the 151-1C and 151-2C DC breaker panels due to age and normal wear over time.…
Formax FD 8732HS Optical Media Shredder for use at 731-2N.…
SRNL often receives samples from the SRS Tank Farm and DWPF for chemical and physical property measurements.…
A new Isolator Inert Glovebox (GB) and supporting gas services are to be installed in Building 723-15A, Metal Printing Laboratory.…